Building or altering in Geneva
Every project in Geneva starts with the plot: zone, floor area ratios, distances to boundaries, protected trees, easements and heritage. These set what is possible before the first sketch.
The permit application is then prepared under the appropriate procedure — fast-track procedure (APA) or full application (DD) — and followed through to the decision, before tendering and site supervision.
Types of project
- New villas with high energy performance, particularly in zone 5.
- Renovation and alteration: extensions, additional storeys, interior reorganisation.
- Interior architecture: plans, materials, lighting and built-in furniture, with 3D images so you can decide before anything is built.
- Surveys and quantity take-offs: as-built drawings, quantities and area calculations.
The canton’s 45 municipalities
- Aire-la-Ville
- Anières
- Avully
- Avusy
- Bardonnex
- Bellevue
- Bernex
- Carouge
- Cartigny
- Céligny
- Chancy
- Chêne-Bougeries
- Chêne-Bourg
- Choulex
- Collex-Bossy
- Collonge-Bellerive
- Cologny
- Confignon
- Corsier
- Dardagny
- Genève
- Genthod
- Grand-Saconnex
- Gy
- Hermance
- Jussy
- Laconnex
- Lancy
- Meinier
- Meyrin
- Onex
- Perly-Certoux
- Plan-les-Ouates
- Pregny-Chambésy
- Presinge
- Puplinge
- Russin
- Satigny
- Soral
- Thônex
- Troinex
- Vandœuvres
- Vernier
- Versoix
- Veyrier
Frequently asked questions
Do I need a permit to extend a villa in Geneva?
Yes, in most cases. Depending on the scale of the works, a fast-track procedure (APA) or a full application (DD) is required; a check of the plot determines this from the outset.
How long does it take to obtain a permit?
30 days under the fast-track procedure and 60 days under the ordinary procedure from a complete application, not counting the preparation of the application or any additional information requested.
Can we communicate in Spanish or English?
Yes: meetings and project follow-up can be conducted in French, Spanish or English.